Scottish government grants planning consent for 1.8GW/40GWh UK pumped hydro project

Gilkes Energy has been awarded planning consent for its Earba Pumped Storage Hydro (PSH) scheme.

Scottish government grants planning consent for 1.8GW/40GWh UK pumped hydro project

You are not logged in

If you want to read more, join the  ENERGY-HUB club

Login

Try the monthly membership in the ENERGY-HUB club for free!

Related articles

The evolving regionality of the UK battery storage market

With over 9GWh of operational grid-scale BESS (battery energy storage system) capacity in the UK—and a strong pipeline—it’s worth…

BESS revenue in Australia’s NEM drops 40% on average in March 2025

A reduction in price volatility has seen the battery energy storage system (BESS) revenue decrease by 40% in Australia’s National…

Inside La Muela: Europe’s largest pumped storage hydropower plant

Enlit on the Road visited La Muela, the largest pumped storage hydropower plant in Europe, to find out how Iberdola’s giant batter…

Battery developers race for Dutch grid access as TenneT unlocks 9 GW capacity

Dutch transmission system operator (TSO) TenneT has unlocked over 9 GW of high-voltage grid capacity by introducing flexible contr…

US BESS investment ‘already impacted’ by tariffs, but industry predicted to remain resilient

Tariffs announced on Donald Trump’s ‘Liberation Day’ have already caused battery storage project deals to fall through in the US, …

ENERGY-HUB is a modern independent platformsharing news and analytic articles from the energy sector on a daily basis. Within our portfolio we monitor czech, slovak and foreign press releases.

89247
Number of published news
2092
Number of published events
1183
Number of published articles
ENERGY-HUB uses ČTK news (The Czech News Agency), the content is protected by copyright law.
Transcription, distribution, or other dissemination of the whole or of a part of the content is prohibited without prior consent.
Drtinova 557/10, 150 00 Praha 5, Česká republika